Road work begins Monday, Sept. 17, on eastbound US 12 between mileposts 15 and 16, with a one-lane closure from 7 a.m. to 3:30 p.m. through Thursday, Sept. 24.
SR 109 near Moclips and Taholah will see single-lane alternating traffic and reduced speed limits through December 2026 as part of a fish barrier removal project. Temporary closures for bridge beam installation on SR 109 are scheduled for Sept. 22 from 9 a.m. to 4 p.m., lasting up to 45 minutes each.
Additional road work includes tree trimming on SR 6 from Sept. 14 to 30 and I-5 guardrail repairs near milepost 88 on Sept. 21.