WSDOT announced ongoing road construction and closures in the Aberdeen area for September 2026. Temporary traffic stops and lane reductions are scheduled on SR 109, SR 6, and I-5 through mid-October.
SR 109 will see paving work on September 12 and 15, with temporary traffic lights and single-lane alternating traffic. SR 6 will have single-lane traffic between Clinton Road and Twin Oaks Road from September 14 to October 12 for water main replacement. I-5 will have nightly right-lane closures from September 13 to 16 for guardrail repairs.