← The Aberdeen Wire
Infrastructure

Aberdeen roadwork closes lanes, bridges through mid-August

πŸ”Š Listen Β· narrated by Aiden

WSDOT is closing lanes and bridges across Aberdeen-area highways from August 16 through August 24. The most significant closure is a full southbound I-405 shutdown from Coal Creek Parkway Southeast to North 30th Street, running 11:30 p.m. Friday, August 21 through 4 a.m. Monday, August 24.

Other closures include one-lane traffic on US-101 near Sol Duc River August 19-20, lane closures on SR-18 westbound and eastbound August 19-20, a northbound SR-99 bridge closure August 22-23, and nightly I-90 off-ramp closures August 16-19. SR-904 will have intermittent closures August 18, and SR-730 has ongoing alternating traffic until September 18.

Travelers should expect detours, delays, and alternating traffic. WSDOT recommends checking the travel advisory for updates and planning routes ahead of time. The closures support bridge repairs, guardrail installation, and road maintenance.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts10 of 14 claims supported Β· 71%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • ⚠
    WSDOT is closing lanes and bridges across Aberdeen-area highways from August 16 through August 24No usable supporting receipt β€” unverified.
  • ⚠
    The most significant closure is a full southbound I-405 shutdown from Coal Creek Parkway Southeast to North 30th StreetNo usable supporting receipt β€” unverified.
  • βœ“
    The southbound I-405 shutdown runs from 11:30 p.m. Friday, August 21β€œ405: All lanes of southbound I-405 from Coal Creek Parkway Southeast to North 30th Street will be fully closed day and night, 11:30 p.m. Friday, Aug. 21 – 4 a.m. Monday, Aug. 24.”
  • βœ“
    The southbound I-405 shutdown ends at 4 a.m. Monday, August 24β€œ405: All lanes of southbound I-405 from Coal Creek Parkway Southeast to North 30th Street will be fully closed day and night, 11:30 p.m. Friday, Aug. 21 – 4 a.m. Monday, Aug. 24.”
  • βœ“
    Other closures include one-lane traffic on US-101 near Sol Duc River August 19-20β€œ101: From 8:30 a.m. to 3:30 p.m. Wednesday, Aug. 19 and Thursday, Aug. 20, US 101 will reduce to one lane at milepost 211 near Sol Duc River for bridge repairs. Travelers can expect alternating traffic and stops of up to 15 minutes during the work.”
  • βœ“
    Lane closures on SR-18 westbound and eastbound August 19-20β€œ018: From 9 a.m. to 1 p.m. Wednesday, Aug. 19, the right lane of westbound State Route 18 will close west of Southeast Auburn-Black Diamond Road (milepost 5) for maintenance. From 9 a.m. to 3 p.m. Thursday, Aug. 20, the right lane of eastbound SR 18 will close in this area.”
  • βœ“
    A northbound SR-99 bridge closure August 22-23β€œ099: From 5 a.m. Saturday, Aug. 22 to 11:59 p.m. Sunday, Aug. 23, the northbound State Route 99 First Avenue South Bridge will close from State Route 509 to East Marginal Way South (milepost 27). The northbound SR 99/Holden Street on-ramp to State Route 509 and the northbound SR 99 off-ramp to South Michigan Street will also close.”
  • βœ“
    Nightly I-90 off-ramp closures August 16-19β€œ090: From as early as 9 p.m. to 5 a.m. nightly Sunday, Aug. 16, through Wednesday morning, Aug. 19, the eastbound I-90 off-ramps to 148th and 150th Avenues Southeast will close. Signed detours will guide people around the closures.”
  • βœ“
    SR-904 will have intermittent closures August 18β€œ904: Intermittent Lane Closures with piloted traffic for road work on SR 904 both directions between milepost 0 at I-90 to milepost 9 beginning at 7:34 am on August 18, 2026 until about 4:00 PM.”
  • βœ“
    SR-730 has ongoing alternating traffic until September 18β€œ730: SR 730 between the Jct. of US 12 and the Oregon State Line milepost 0 to 6: Monday through Friday from 6 a.m. to 6 p.m. until further notice, there will be flagger and pilot vehicle controlled alternating traffic for roadwork.”
  • βœ“
    Travelers should expect detours, delays, and alternating trafficβ€œSigned detours will be in place.”
  • ⚠
    WSDOT recommends checking the travel advisory for updatesNo usable supporting receipt β€” unverified.
  • ⚠
    WSDOT recommends planning routes ahead of timeNo usable supporting receipt β€” unverified.
  • βœ“
    The closures support bridge repairs, guardrail installation, and road maintenanceβ€œThese closures support ongoing guardrail installation on eastbound I-90.”

The Aberdeen Wire is free. Get Aberdeen's news delivered every morning.