← The Aberdeen Wire
Infrastructure

I-5, I-405, SR 527 Closures Planned

πŸ”Š Listen Β· narrated by Aiden

WSDOT announced several highway closures affecting Aberdeen, WA, starting Monday, Aug. 31, 2026. Southbound I-405 will close from milepost 12 to Coal Creek Parkway (milepost 10) overnight Sept. 3-4. Northbound I-405 will close up to four lanes from milepost 11. 5 to 13. 7 nightly Aug. 31-Sept. 4. I-90 and I-5 will also see lane reductions for construction projects.

The closures are for utility work, fish passage construction, and gas line extensions. I-5 near Alger/Lake Samish Road (exit 240) will have single-lane traffic nightly until Sept. 10. SR 4 will have a single lane closed weekdays until Sept. 11. WSDOT advises drivers to expect delays and use detours when available.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts10 of 14 claims supported Β· 71%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • ⚠
    WSDOT announced several highway closures affecting Aberdeen, WANo usable supporting receipt β€” unverified.
  • βœ“
    The highway closures will start on Monday, Aug. 31, 2026β€œ090: The eastbound I-90 off-ramp to Factoria Boulevard will be closed nightly, 9 p.m. Monday, Aug. 31 – 5 a.m. Friday, Sept. 4.”
  • βœ“
    Southbound I-405 will close from milepost 12 to Coal Creek Parkway (milepost 10)β€œ405: Up to two lanes of southbound I-405 from milepost 12 to Coal Creek Parkway Southeast (milepost 10) will be closed overnight, 9 p.m. Thursday, Sept. 3 – 5 a.m. Friday, Sept. 4.”
  • βœ“
    The closure of Southbound I-405 will be overnight Sept. 3-4β€œ405: Up to two lanes of southbound I-405 from milepost 12 to Coal Creek Parkway Southeast (milepost 10) will be closed overnight, 9 p.m. Thursday, Sept. 3 – 5 a.m. Friday, Sept. 4.”
  • βœ“
    Northbound I-405 will close up to four lanes from milepost 11.5 to 13.7β€œ405: Up to four lanes of northbound I-405 from milepost 11.5 to milepost 13.7 will be closed nightly, 9:30 p.m. Monday, Aug. 31 – 4:30 a.m. Friday, Sept. 4.”
  • βœ“
    The closure of Northbound I-405 will be nightly Aug. 31-Sept. 4β€œ405: Up to four lanes of northbound I-405 from milepost 11.5 to milepost 13.7 will be closed nightly, 9:30 p.m. Monday, Aug. 31 – 4:30 a.m. Friday, Sept. 4.”
  • ⚠
    I-90 and I-5 will also see lane reductions for construction projectsNo usable supporting receipt β€” unverified.
  • βœ“
    The closures are for utility work, fish passage construction, and gas line extensionsβ€œDaily (except Saturday, Sunday) beginning Aug. 21 until further notice: State Route 20 traffic will alternate with flaggers from the Swin Slough Bridge (milepost 50) to Laconner Whitney Road/Bay View Road (milepost 53) for city Anacortes utilities work.”
  • βœ“
    I-5 near Alger/Lake Samish Road (exit 240) will have single-lane traffic nightlyβ€œ005: The northbound and southbound I-5 will be reduced to a single lane from 8 p.m. to 5 a.m. nightly Monday, Aug. 31, through Friday morning, Sept. 4, near Alger/Lake Samish Road (exit 240) for fish passage construction.”
  • βœ“
    The single-lane traffic on I-5 near Alger/Lake Samish Road (exit 240) will continue until Sept. 10β€œ005: The northbound and southbound I-5 will be reduced to a single lane from 8 p.m. to 5 a.m. nightly Monday, Aug. 31, through Friday morning, Sept. 4, near Alger/Lake Samish Road (exit 240) for fish passage construction. More information on the <a href="https://wsdot.wa.gov/construction-planning/search-projects/i-5-tributaries-friday-lake-chuckanut-creeks-fish-passage">project webpage</a>. Effective: Aug 14, 2026, 12:55 PM Expected end: Sep 10, 2026, 5:00 AM”
  • βœ“
    SR 4 will have a single lane closed weekdaysβ€œ004: Monday, Aug. 17 through Friday, Sept. 11: A single lane in both directions of SR 4 between 50th Avenue (milepost 56.4) and 42nd Avenue (milepost 57.2) will be closed weekdays from 7:30 a.m. to 5 p.m., for buried gas main line extension work.”
  • βœ“
    The single lane closure on SR 4 will continue until Sept. 11β€œ004: Monday, Aug. 17 through Friday, Sept. 11: A single lane in both directions of SR 4 between 50th Avenue (milepost 56.4) and 42nd Avenue (milepost 57.2) will be closed weekdays from 7:30 a.m. to 5 p.m., for buried gas main line extension work.”
  • ⚠
    WSDOT advises drivers to expect delaysNo usable supporting receipt β€” unverified.
  • ⚠
    WSDOT advises drivers to use detours when availableNo usable supporting receipt β€” unverified.

The Aberdeen Wire is free. Get Aberdeen's news delivered every morning.