SR 105 will have single-lane traffic in both directions between mileposts 6.8 and 7.1 from Nov. 2 to Nov. 5, 7 a.m. to 4 p.m. daily.
Flaggers will direct travelers through the area during the work period.
SR 105 will have single-lane traffic in both directions between mileposts 6.8 and 7.1 from Nov. 2 to Nov. 5, 7 a.m. to 4 p.m. daily.
Flaggers will direct travelers through the area during the work period.
Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the modelβs assessment; readers can inspect the quote. Source: original document β
105 [18 mi from Aberdeen]: Monday, Nov. 2 to Thursday, Nov. 5: Travelers in both directions of SR 105 between mileposts 6.8 and 7.1, will take turns moving through a single lane each day from 7 a.m. to 4 p.m., for work to build up the shoulder along the roadway. Flaggers will direct travelers through the area. Plan ahead and expect delays. Effective: Nov 2, 2026, 5:00 AM Expected end: Nov 5, 2026, 4:00 PM Source: https://wsdot.wa.gov/travel/road-construction
The Aberdeen Wire is free. Get Aberdeen's news delivered every morning.