← The Aberdeen Wire
Infrastructure

SR 105 shoulder work Nov. 2-5

πŸ”Š Listen Β· narrated by Aiden

WSDOT will restrict travel on SR 105 between mileposts 6.8 and 7.1 to one lane each day from 7 a.m. to 4 p.m. on Nov. 2-5 for shoulder construction work.

Flaggers will direct traffic through the single-lane section during these hours.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts4 of 4 passages supported Β· 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document β†—

  • βœ“
    SR 105 shoulder work Nov. 2-5β€œ105 [18 mi from Aberdeen]: Monday, Nov. 2 to Thursday, Nov. 5: Travelers in both directions of SR 105 between mileposts 6.8 and 7.1, will take turns moving through a single lane each day from 7 a.m. to 4 p.m., for work to build up the shoulder along the roadway.”
  • βœ“
    WSDOT will limit SR 105 to single-lane traffic between mileposts 6.8 and 7.1 daily from 7 a.m. to 4 p.m. for shoulder construction.β€œ105 [18 mi from Aberdeen]: Monday, Nov. 2 to Thursday, Nov. 5: Travelers in both directions of SR 105 between mileposts 6.8 and 7.1, will take turns moving through a single lane each day from 7 a.m. to 4 p.m., for work to build up the shoulder along the roadway.”
  • βœ“
    WSDOT will restrict travel on SR 105 between mileposts 6.8 and 7.1 to one lane each day from 7 a.m. to 4 p.m. on Nov. 2-5 for shoulder construction work.β€œ105 [18 mi from Aberdeen]: Monday, Nov. 2 to Thursday, Nov. 5: Travelers in both directions of SR 105 between mileposts 6.8 and 7.1, will take turns moving through a single lane each day from 7 a.m. to 4 p.m., for work to build up the shoulder along the roadway.”
  • βœ“
    Flaggers will direct traffic through the single-lane section during these hours.β€œFlaggers will direct travelers through the area. Plan ahead and expect delays.”
Source text saved for this check (2026-11-02T13:34:29.063Z)
WSDOT highway construction and road closures within 50 miles of Aberdeen β€” 11/2/2026:

105 [18 mi from Aberdeen]: Monday, Nov. 2 to Thursday, Nov. 5: Travelers in both directions of SR 105 between mileposts 6.8 and 7.1, will take turns moving through a single lane each day from 7 a.m. to 4 p.m., for work to build up the shoulder along the roadway. 

Flaggers will direct travelers through the area. Plan ahead and expect delays.
Effective: Nov 2, 2026, 5:00 AM
Expected end: Nov 5, 2026, 4:00 PM

006 [21 mi from Aberdeen]: Monday, Nov. 2 to Thursday, Nov. 5: Travelers in both directions of SR 6 between the US 101 interchange (milepost 0.00) and Katula Road (milepost 30.0) will take turns moving through a single lane daily from 6:30 a.m. to 4 p.m., for moving. 

Slow down, stay focused and expect delays.
Effective: Nov 2, 2026, 5:00 AM
Expected end: Nov 5, 2026, 4:00 PM

109 [28 mi from Aberdeen]: Expect daytime single-lane alternating traffic on SR 109 at milepost 33.8 north of Moclips. Crews are working on landscaping and other final touches for a fish passage project. Read more on the project webpage.
Effective: May 20, 2026, 1:40 PM
Expected end: Dec 31, 2026, 1:40 PM

109 [31 mi from Aberdeen]: Expect daytime single-lane alternating on SR 109 at milepost 37 near Taholah. Crews are working on landscaping and other final touches for a fish passage project. Read more on the project webpage.
Effective: May 20, 2026, 1:52 PM
Expected end: Dec 31, 2026, 1:52 PM

006 [37 mi from Aberdeen]: Monday, Nov. 2 to Tuesday, Nov. 30: Travelers in both directions of SR 6 between Mauerman Road (milepost 29.7) and Stevens Road (milepost 33.1) will take turns moving through a single lane each day from 7 a.m. to 5:30 p.m., for tree trimming around power lines. 

Flaggers will direct travelers through the work zone. Slow down, have patience and expect delays.
Effective: Nov 2, 2026, 5:00 AM
Expected end: Nov 30, 2026, 5:30 PM

The Aberdeen Wire is free. Get Aberdeen's news delivered every morning.