State Route 109 will see temporary traffic stops for paving on Tuesday, Sept. 8, at two locations north of Aberdeen. The first stop will occur at milepost 33. 8 north of Moclips. The second will be at milepost 37 near Taholah. Both locations will experience daytime traffic stops up to 15 minutes. Temporary traffic lights and single-lane alternating traffic will remain in place. Work may be rescheduled if rain occurs. The paving project is part of a larger effort to remove fish barriers along SR 109. The work is scheduled to continue through Dec. 31, 2026.
SR 109 Paving Work Begins Tuesday
π Listen Β· narrated by Aiden
π Source: WSDOT β Highway Construction & Closures β https://wsdot.wa.gov/travel/road-construction
Source receipts8 of 8 claims supported Β· 100%
Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β
- βState Route 109 will see temporary traffic stops for paving on Tuesday, Sept. 8βOn Tuesday, Sept. 8, expect daytime traffic stops up to 15 minutes on SR 109 at milepost 33.8 north of Moclips for paving. Work may be rescheduled if it rains. Temporary traffic lights and single-lane alternating traffic remain in place. Read more on the <a href="https://wsdot.wa.gov/construction-planning/search-projects/sr-109-ocean-city-taholah-remove-fish-barriers">project webpage</a>.β
- βThe first stop will occur at milepost 33.8 north of MoclipsβOn Tuesday, Sept. 8, expect daytime traffic stops up to 15 minutes on SR 109 at milepost 33.8 north of Moclips for paving.β
- βThe second stop will be at milepost 37 near TaholahβOn Tuesday, Sept. 8, expect daytime traffic stops up to 15 minutes on SR 109 at milepost 37 near Taholah for paving.β
- βBoth locations will experience daytime traffic stops up to 15 minutesβOn Tuesday, Sept. 8, expect daytime traffic stops up to 15 minutes on SR 109 at milepost 33.8 north of Moclips for paving. Work may be rescheduled if it rains. Temporary traffic lights and single-lane alternating traffic remain in place. Read more on the <a href="https://wsdot.wa.gov/construction-planning/search-projects/sr-109-ocean-city-taholah-remove-fish-barriers">project webpage</a>.β
- βTemporary traffic lights and single-lane alternating traffic will remain in placeβTemporary traffic lights and single-lane alternating traffic remain in place.β
- βWork may be rescheduled if rain occursβWork may be rescheduled if it rains.β
- βThe paving project is part of a larger effort to remove fish barriers along SR 109βRead more on the <a href="https://wsdot.wa.gov/construction-planning/search-projects/sr-109-ocean-city-taholah-remove-fish-barriers">project webpage</a>.β
- βThe work is scheduled to continue through Dec. 31, 2026βExpected end: Dec 31, 2026, 1:40 PM 109 [31 mi from Aberdeen]: On Tuesday, Sept. 8, expect daytime traffic stops up to 15 minutes on SR 109 at milepost 37 near Taholah for paving. Work may be rescheduled if it rains. Temporary traffic lights and single-lane alternating traffic remain in place. Read more on the <a href="https://wsdot.wa.gov/construction-planning/search-projects/sr-109-ocean-city-taholah-remove-fish-barriers">project webpage</a>. Effective: May 20, 2026, 1:52 PM Expected end: Dec 31, 2026, 1:52 PM β
The Aberdeen Wire is free. Get Aberdeen's news delivered every morning.