← The Aberdeen Wire
Infrastructure

SR 24 bridge work, I-405 closures begin

πŸ”Š Listen Β· narrated by Aiden

State Route 24 bridge maintenance will cause slowdowns on Sept. 2-3 near Othello, with alternating one-lane traffic and reduced speeds. I-405 closures begin Monday, Aug. 24, including nightly ramp closures and a bridge project on SR 20.

The Marblemount Bridge on SR 20 will close nightly from 8 p.m. to 4 a.m. through Sept. 4, except weekends. I-405 ramps and lanes will close nightly through Aug. 28, with additional closures starting Aug. 28 through Aug. 31. WSDOT advises drivers to expect delays and use detours where provided.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts8 of 14 claims supported Β· 57%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    State Route 24 bridge maintenance will cause slowdowns on Sept. 2-3 near Othelloβ€œ024: Travelers on SR 24, five miles south of Othello will encounter slowdowns and delays at milepost 76 on Sept. 2 and Sept. 3 from 7 a.m. to 3:30 p.m. while crews perform bridge maintenance and repair.”
  • βœ“
    Alternating one-lane traffic will occur during State Route 24 bridge maintenanceβ€œ024: Travelers on SR 24, five miles south of Othello will encounter slowdowns and delays at milepost 76 on Sept. 2 and Sept. 3 from 7 a.m. to 3:30 p.m. while crews perform bridge maintenance and repair. Expect alternating, one-lane, two-way traffic, flaggers, and reduced speed limits.”
  • βœ“
    Reduced speeds will occur during State Route 24 bridge maintenanceβ€œ024: Travelers on SR 24, five miles south of Othello will encounter slowdowns and delays at milepost 76 on Sept. 2 and Sept. 3 from 7 a.m. to 3:30 p.m. while crews perform bridge maintenance and repair. Expect alternating, one-lane, two-way traffic, flaggers, and reduced speed limits.”
  • ⚠
    I-405 closures begin Monday, Aug. 24No usable supporting receipt β€” unverified.
  • βœ“
    Nightly ramp closures will occur on I-405β€œ405: The on-ramps to westbound and eastbound SR 520 will be closed nightly, 9 p.m. Monday, Aug. 24 – 5 a.m. Friday, Aug. 28.”
  • ⚠
    A bridge project on SR 20 will cause I-405 closuresNo usable supporting receipt β€” unverified.
  • βœ“
    The Marblemount Bridge on SR 20 will close nightly from 8 p.m. to 4 a.m.β€œNightly from 8 p.m. to 4 a.m. the next day (except Friday, Saturday and Sunday) beginning Monday, Aug. 24 to 4 a.m. Friday, Sept. 4, both directions of the State Route 20 Marblemount Bridge (milepost 106) will close for the Skagit County Marblemount Bridge Project. For more information, visit the <a href="https://www.skagitcounty.net/Departments/PublicWorksEngineering/marblemount-bridge.htm" target="_blank">Skagit County</a> page.”
  • βœ“
    The Marblemount Bridge on SR 20 will close through Sept. 4β€œNightly from 8 p.m. to 4 a.m. the next day (except Friday, Saturday and Sunday) beginning Monday, Aug. 24 to 4 a.m. Friday, Sept. 4, both directions of the State Route 20 Marblemount Bridge (milepost 106) will close for the Skagit County Marblemount Bridge Project.”
  • βœ“
    The Marblemount Bridge on SR 20 will not close on weekendsβ€œNightly from 8 p.m. to 4 a.m. the next day (except Friday, Saturday and Sunday) beginning Monday, Aug. 24 to 4 a.m. Friday, Sept. 4, both directions of the State Route 20 Marblemount Bridge (milepost 106) will close for the Skagit County Marblemount Bridge Project.”
  • ⚠
    I-405 ramps and lanes will close nightly through Aug. 28No usable supporting receipt β€” unverified.
  • ⚠
    Additional closures on I-405 will start Aug. 28No usable supporting receipt β€” unverified.
  • ⚠
    Additional closures on I-405 will end Aug. 31No usable supporting receipt β€” unverified.
  • βœ“
    WSDOT advises drivers to expect delaysβ€œTravelers on SR 24, five miles south of Othello will encounter slowdowns and delays at milepost 76 on Sept. 2 and Sept. 3 from 7 a.m. to 3:30 p.m. while crews perform bridge maintenance and repair. Expect alternating, one-lane, two-way traffic, flaggers, and reduced speed limits.”
  • ⚠
    WSDOT advises drivers to use detours where providedNo usable supporting receipt β€” unverified.

The Aberdeen Wire is free. Get Aberdeen's news delivered every morning.