← The Aberdeen Wire
Infrastructure

SR 6 lane closures Nov. 2-5

πŸ”Š Listen Β· narrated by Aiden

Travelers on SR 6 between US 101 and Katula Road will take turns moving through a single lane daily from 6:30 a.m. to 4 p.m. for moving. The closure will be effective from Nov. 2, 2026, at 5:00 a.m. through Nov. 5, 2026, at 4:00 p.m.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported Β· 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document β†—

  • βœ“
    SR 6 lane closures Nov. 2-5β€œ006 [21 mi from Aberdeen]: Monday, Nov. 2 to Thursday, Nov. 5: Travelers in both directions of SR 6 between the US 101 interchange (milepost 0.00) and Katula Road (milepost 30.0) will take turns moving through a single lane daily from 6:30 a.m. to 4 p.m., for moving. Slow down, stay focused and expect delays. Effective: Nov 2, 2026, 5:00 AM Expected end: Nov 5, 2026, 4:00 PM Source: https://wsdot.wa.gov/travel/road-construction”
  • βœ“
    Single-lane traffic on SR 6 between US 101 and Katula Road will occur daily 6:30 a.m. to 4 p.m. from Nov. 2-5.β€œMonday, Nov. 2 to Thursday, Nov. 5: Travelers in both directions of SR 6 between the US 101 interchange (milepost 0.00) and Katula Road (milepost 30.0) will take turns moving through a single lane daily from 6:30 a.m. to 4 p.m., for moving.”
  • βœ“
    Travelers on SR 6 between US 101 and Katula Road will take turns moving through a single lane daily from 6:30 a.m. to 4 p.m. for moving. The closure will be effective from Nov. 2, 2026, at 5:00 a.m. through Nov. 5, 2026, at 4:00 p.m.β€œTravelers in both directions of SR 6 between the US 101 interchange (milepost 0.00) and Katula Road (milepost 30.0) will take turns moving through a single lane daily from 6:30 a.m. to 4 p.m., for moving.”
Source text saved for this check (2026-11-03T19:35:27.628Z)
006 [21 mi from Aberdeen]: Monday, Nov. 2 to Thursday, Nov. 5: Travelers in both directions of SR 6 between the US 101 interchange (milepost 0.00) and Katula Road (milepost 30.0) will take turns moving through a single lane daily from 6:30 a.m. to 4 p.m., for moving. 

Slow down, stay focused and expect delays.
Effective: Nov 2, 2026, 5:00 AM
Expected end: Nov 5, 2026, 4:00 PM
Source: https://wsdot.wa.gov/travel/road-construction

The Aberdeen Wire is free. Get Aberdeen's news delivered every morning.