State Route 9 near Kalloch Road (MP 59) will operate as a single lane with alternating traffic through a bypass road starting Aug. 3, 2026, for 42 days until Sept. 14, 2026. The change is part of fish passage construction at unnamed tributaries of Nookachamps and Hansen Creeks. WSDOT expects delays in the area during the project. Residents should plan for extended travel times near Kalloch Road during the 42-day closure period.
SR 9 Fish Passage Work Begins in Aberdeen Area
π Listen Β· narrated by Aiden
π Source: WSDOT β Highway Construction & Closures β https://wsdot.wa.gov/travel/road-construction
Source receipts5 of 6 claims supported Β· 83%
Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β
- βState Route 9 near Kalloch Road (MP 59) will operate as a single lane with alternating traffic through a bypass roadβ009: SR 9 is reduced to a single lane near Kalloch Road (MP 59) with a signal alternating northbound and southbound traffic through a bypass road for 42 days, until Sept. 14 for fish passage construction. Expect delays in the area.β
- βThe change will start on Aug. 3, 2026βEffective: Aug 3, 2026, 9:02 AMβ
- βThe change will end on Sept. 14, 2026β009: SR 9 is reduced to a single lane near Kalloch Road (MP 59) with a signal alternating northbound and southbound traffic through a bypass road for 42 days, until Sept. 14 for fish passage construction. Expect delays in the area.β
- βThe change is part of fish passage construction at unnamed tributaries of Nookachamps and Hansen Creeksβ009: SR 9 is reduced to a single lane near Kalloch Road (MP 59) with a signal alternating northbound and southbound traffic through a bypass road for 42 days, until Sept. 14 for fish passage construction. Expect delays in the area.β
- βWSDOT expects delays in the area during the projectβExpect delays in the area.β
- β Residents should plan for extended travel times near Kalloch Road during the 42-day closure periodNo usable supporting receipt β unverified.
The Aberdeen Wire is free. Get Aberdeen's news delivered every morning.