← The Aberdeen Wire
Weekly Briefing

Aberdeen this week: SR 6 construction to begin Nov. 4

πŸ”Š Listen Β· narrated by Aiden

Alternating traffic with flaggers will start on SR 6 near Katula Road and Jones Creek on November 4, 2026.

Alternating traffic with flaggers begins on SR 105 at milepost 20 near Panoramic Lane starting Nov. 4, 2026, at 7:05 a.m.

Single-lane traffic through Aberdeen area for tree trimming around power lines, Nov. 2-30, 7 a.m.-5:30 p.m. daily.

Single-lane traffic on SR 6 between US 101 and Katula Road will occur daily 6:30 a.m. to 4 p.m. from Nov. 2-5.

Single-lane traffic on SR 105 between mileposts 6.8 and 7.1 will occur daily from 7 a.m. to 4 p.m. Nov. 2-5.

πŸ“„ Source: Weekly briefing β€” built from this week's The Aberdeen Wire stories, each line checked against its story
Source receipts7 of 7 passages supported Β· 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote.

  • βœ“
    Aberdeen this week: SR 6 construction to begin Nov. 4β€œSR 6 construction to begin Nov. 4”
  • βœ“
    Alternating traffic with flaggers on SR 6 near Katula Road and Jones Creek starting Nov. 4, 2026.β€œAlternating traffic with flaggers on SR 6 near Katula Road and Jones Creek starting Nov. 4, 2026.”
  • βœ“
    Alternating traffic with flaggers will start on SR 6 near Katula Road and Jones Creek on November 4, 2026.β€œAlternating traffic with flaggers on SR 6 near Katula Road and Jones Creek starting Nov. 4, 2026.”
  • βœ“
    Alternating traffic with flaggers begins on SR 105 at milepost 20 near Panoramic Lane starting Nov. 4, 2026, at 7:05 a.m.β€œWSDOT will implement alternating traffic with flaggers on SR 105 both directions at milepost 20 near Panoramic Lane beginning Nov. 4, 2026, at 7:05 a.m.”
  • βœ“
    Single-lane traffic through Aberdeen area for tree trimming around power lines, Nov. 2-30, 7 a.m.-5:30 p.m. daily.β€œSingle-lane traffic through Aberdeen area for tree trimming around power lines, Nov. 2-30, 7 a.m.-5:30 p.m. daily.”
  • βœ“
    Single-lane traffic on SR 6 between US 101 and Katula Road will occur daily 6:30 a.m. to 4 p.m. from Nov. 2-5.β€œSingle-lane traffic on SR 6 between US 101 and Katula Road will occur daily 6:30 a.m. to 4 p.m. from Nov. 2-5.”
  • βœ“
    Single-lane traffic on SR 105 between mileposts 6.8 and 7.1 will occur daily from 7 a.m. to 4 p.m. Nov. 2-5.β€œSR 105 will have single-lane traffic in both directions between mileposts 6.8 and 7.1 from Nov. 2 to Nov. 5, 7 a.m. to 4 p.m. daily.”
Source text saved for this check (2026-11-09T09:00:01.324Z)
SR 6 construction to begin Nov. 4
Alternating traffic with flaggers on SR 6 near Katula Road and Jones Creek starting Nov. 4, 2026.
Construction on SR 6 will begin on November 4, 2026, with alternating traffic using flaggers from milepost 30.5 near Katula Road to milepost 31.00 near Jones Creek.

SR 105 Traffic Alternating with Flaggers Nov. 4, 2026
WSDOT announces alternating traffic with flaggers on SR 105 at milepost 20 near Panoramic Lane starting Nov. 4, 2026.
WSDOT will implement alternating traffic with flaggers on SR 105 both directions at milepost 20 near Panoramic Lane beginning Nov. 4, 2026, at 7:05 a.m.
The closure will remain in effect until further notice, according to WSDOT's road construction page.

SR 6 tree trimming causes lane closures Nov. 2-30
Single-lane traffic through Aberdeen area for tree trimming around power lines, Nov. 2-30, 7 a.m.-5:30 p.m. daily.
Travelers in both directions of SR 6 between Mauerman Road and Stevens Road will take turns moving through a single lane each day from 7 a.m. to 5:30 p.m. for tree trimming around power lines.

Flaggers will direct travelers through the work zone, with slow-downs and delays expected during the closure period.

SR 6 lane closures Nov. 2-5
Single-lane traffic on SR 6 between US 101 and Katula Road will occur daily 6:30 a.m. to 4 p.m. from Nov. 2-5.
Travelers on SR 6 between US 101 and Katula Road will take turns moving through a single lane daily from 6:30 a.m. to 4 p.m. for moving.
The closure will be effective from Nov. 2, 2026, at 5:00 a.m. through Nov. 5, 2026, at 4:00 p.m.

SR 105 lane closure Nov. 2-5
Single-lane traffic on SR 105 between mileposts 6.8 and 7.1, Nov. 2-5, 7 a.m. to 4 p.m. daily.
SR 105 will have single-lane traffic in both directions between mileposts 6.8 and 7.1 from Nov. 2 to Nov. 5, 7 a.m. to 4 p.m. daily.

Flaggers will direct travelers through the area during the work period.

The Aberdeen Wire is free. Get Aberdeen's news delivered every morning.